Manufacturing

The Factory Brain.

The orchestration layer between ERP and PLC — the one neither system covers. AI recommends. Humans approve. The PLC executes.

What it does

Seven domains, one planning layer.

Every recommendation is explainable and reversible — planners approve, override, and set priorities.

  • Sales

    Demand prediction, order prioritisation, delivery prediction

  • Inventory

    Stock optimisation, raw material alerts, reorder points

  • Production

    Finite capacity scheduling, line balancing, shift planning

  • Maintenance

    Predictive maintenance, planned downtime, spare-parts prediction

  • Quality

    Vision inspection, root-cause suggestions, rework prediction

  • Dispatch

    Truck planning, delivery ETA, route consolidation

AI never replaces the PLC. It makes PLC-driven factories smarter. Cloud, hybrid, or fully on-premise — 4 to 12+ weeks to deploy.

Human

Approves, overrides, sets priorities

Factory Brain · AI

AI planning · scheduling · optimisation · recommendations

Business & operations

ERP · MES · Inventory · CRM · Purchase · Maintenance · Quality · Dispatch

Deterministic control

SCADA · PLC · CNC · Sensors · Vision systems

Machines

Lines, cells, tooling, plant

10–20%
less machine idle time
Better scheduling
15–30%
less scheduling effort
AI-assisted planning
Lower
inventory carrying cost
Demand prediction
Improved
on-time delivery
Dynamic dispatch
Who needs a Factory Brain
  • Schedules built in spreadsheets

    Planners re-plan by hand whenever an order or machine changes

  • Unplanned downtime

    Breakdowns found after the line stops, not before

  • ERP says one thing, the floor another

    No layer reconciling plan against actual production

  • Quality caught late

    Defects found at final inspection rather than at the cell

  • Inventory buffered on instinct

    Safety stock covering for forecasts nobody trusts

  • Expertise walking out the door

    Scheduling knowledge held by a handful of people

Industry validation: Siemens, ABB and Hitachi all orchestrate above the PLC rather than replacing it — AI predicts and recommends, automation executes, humans approve.

Deployment posture

Cloud

Fastest, usage-based

Hybrid

On-premise data, 4–8 weeks

On-premise

Fully in-house, 8–12+ weeks

Get started

Bring us one line, one plant, one planning problem.

We baseline idle time and scheduling effort before we start, and report against them after we ship.

Get started

© 2026 Nunnari Labs Private Limited